Cost Benefit Analysis

CBA may also be referred as Optimum Utilization of Resources.

It is all about getting optimum out of the cost (capital) invested & knowing the benefit from any additional cost to be incurred.

It takes into consideration the long term outcomes from the cost being incurred.

Three Major aspects are:
(1) Hard Dollar Savings
(2) Soft Dollar Savings
(3) Cost Avoidance

(1) Hard Dollar Savings - It keeps into consideration Short Term Objectives

(2) Soft Dollar Savings - It takes into consideratio Long Term Objectives

(3) Cost Avoidance - It takes into both the above concepts, focusing more on the future reduction in cost.